Connection Charges

WATER AVAILABILITY CERTIFICATES
Single Family $100.00
Multi-Family & Commercial 200.00 plus costs
NEW OR UPGRADED WATER INSTALLATION CHARGES
Meter Same Side With Crossing
5/8" X 3/4" $3,100 $3,800
1" 3,300 4,000
WATER CAPITAL FACILITY CHARGES
Meter Local Regional Total
5/8" X 3/4" $7,557 $8,579 $16,136
1" 18,890 21,448 40,338
1 1/2" 37,780 42,895 80,675
2" 60,449 68,632 129,081
3" 113,343 137,264 250,607
4" 188,903 214,475 403,378
6" 377,806 428,950 806,756
8" 604,491 686,320 1,290,811
SEWER AVAILABILITY CERTIFICATES
Single Family $100.00
Multi-Family & Commercial 200.00 plus costs
SIDE SEWER PERMITS
Non-Right of Way Connection
Single Family $250.00
Multi-Family 250.00 first unit, plus 10.00 per additional unit
Commercial 250.00 plus .02 per sq. ft. structure
Right of Way Connection
Permit Fee 750.00
Includes King County Right of Way Permit and 2 hours minimum inspection fees. Inspections over 2 hours will be billed upon permit close.
SEWER LOCAL FACILITIES CHARGES
Meter Size Amount
5/8" X 3/4" $8,000
1" 20,004
1 1/2" 40,009
2" 64,015
3" 120,025
4" 200,044
5" 400,089
6" 640,143
WATER & SEWER EXTENSION/REDEVELOPMENT

APPLICATION FEE: 6,000.00 (DEPOSIT PER UTILITY)

Property owner or developer shall pay all District costs in excess of application fee, including administration, engineering, legal permits and inspections plus 15%. A refund will be issued upon project closeout if the deposit exceeds costs. Delinquent accounts shall accrue interest at a rate of not more than the District's bank rate plus four percentage points per year.

This page does not reflect a complete listing of the District's established rates, charges, policies and procedures for water and sewer services and connections. Certain properties, depending on location, may be subject to additional costs and connection requirements.